
How Much Does a Concreter Charge in Australia? (2026 Rates by Job Type)
A standard driveway in Sydney costs somewhere between $4,500 and $12,000. That's a wide range — and if you're a concreter, your ability to price confidently within that range determines whether you win or lose jobs. If you're a homeowner, knowing what's reasonable stops you from overpaying or getting burned by an underquoter. Here's what concreters are actually charging across Australia in 2026.
Concreting Rates in Australia: Quick Reference
| Job Type | Price Per m2 (AUD) | Notes |
|---|---|---|
| Plain/standard concrete | $65 – $90 per m2 | Most common residential work |
| Exposed aggregate | $100 – $150 per m2 | Decorative finish, more preparation |
| Coloured concrete | $90 – $130 per m2 | Oxide or integral colour added |
| Stencilled/stamped concrete | $100 – $160 per m2 | Pattern pressed into surface |
| Polished concrete (outdoor) | $80 – $120 per m2 | Ground and sealed finish |
| Concrete slab (house/garage) | $60 – $85 per m2 | Structural, includes mesh and formwork |
| Footpath / garden path | $65 – $95 per m2 | Narrow widths add cost per m2 |
| Pool surrounds | $95 – $145 per m2 | Wet area, non-slip finish required |
Rates are indicative for 2026 and reflect average market pricing across major Australian cities. Site-specific factors (access, demolition, reinforcement, soil type) affect final pricing significantly.
Full Project Pricing: What Australians Pay for Common Jobs
Concrete Driveway
| Size | Plain Concrete | Exposed Aggregate | Coloured Concrete |
|---|---|---|---|
| Small (30-40 m2) | $2,000 – $3,600 | $3,000 – $6,000 | $2,700 – $5,200 |
| Standard (50-60 m2) | $3,250 – $5,400 | $5,000 – $9,000 | $4,500 – $7,800 |
| Large (80-100 m2) | $5,200 – $9,000 | $8,000 – $15,000 | $7,200 – $13,000 |
Includes preparation, formwork, pour, and standard finish. Demolition of existing driveway adds $1,500-$4,000 depending on size and material.
Concrete Slab
| Purpose | Size | Price Range |
|---|---|---|
| Shed slab | 6m x 6m (36 m2) | $2,200 – $3,060 |
| Garage slab | 6m x 9m (54 m2) | $3,240 – $4,590 |
| Large garage or workshop | 9m x 9m (81 m2) | $4,860 – $6,885 |
| House slab (standard) | 200-250 m2 | $12,000 – $21,250 |
Slab pricing includes mesh reinforcement and formwork. Soil testing, engineering, and fill may add cost on challenging sites.
Garden Paths and Footpaths
| Length and Width | Price Range |
|---|---|
| 10m x 1m (10 m2) | $650 – $950 |
| 20m x 1.2m (24 m2) | $1,560 – $2,280 |
| 30m x 1.5m (45 m2) | $2,925 – $4,275 |
Narrow paths have a higher per-m2 cost due to increased formwork relative to concrete volume.
State-by-State Pricing Variations
Labour costs, material prices, and competition levels vary across Australia. Here's a rough guide to how pricing differs by state:
| State / Territory | Price Variation vs National Average | Notes |
|---|---|---|
| NSW (Sydney) | +10% to +20% | High labour costs, strong demand, access challenges in older suburbs |
| VIC (Melbourne) | +5% to +15% | Strong market, competitive, outer suburbs are competitive |
| QLD (Brisbane/SEQ) | -5% to +5% | Competitive market, high volume, growth corridors |
| WA (Perth) | +10% to +20% | Strong mining economy, higher wages |
| SA (Adelaide) | -5% to -10% | Lower labour costs, moderate competition |
| TAS (Hobart/regional) | -5% to +10% | Lower volume, access and logistics can add cost |
| ACT (Canberra) | +10% to +15% | Government market, strong residential demand, higher labour |
| NT (Darwin) | +15% to +25% | Remote logistics, tropical climate preparation, limited competition |
What Drives the Price Up (And What Drives It Down)
Factors that increase your price:
- Demolition of existing concrete or pavers — budget $50-$80 per m2 for removal
- Poor site access — narrow lanes, steep driveways, tight backyards add significant labour
- Reinforcement requirements — commercial slabs, heavy vehicle use, sandy or reactive soil
- Decorative finishes — exposed aggregate, stencilling, and colouring add materials and time
- Remote location — transport costs for concrete trucks and crew
- Wet areas — pool surrounds and outdoor bathrooms require non-slip coatings and sealing
- Rush jobs — short-notice scheduling increases labour cost
Factors that decrease your price (or should):
- Simple rectangular layouts — less formwork, faster setup
- Good access — concrete truck can pump directly, minimal wheelbarrow work
- Multiple jobs in the same area — mobilisation cost spread across more work
- Off-peak timing — some concreters offer small discounts for slow-season scheduling
How Concreters Should Price Jobs Confidently
This is where most concreters leave money on the table.
The tendency when you're competing against quotes is to undercut. Someone's quoting $8,000 for the same driveway — you go in at $7,200 and hope to win it on price. The problem is that when you price this way, you train your customers to value you on price rather than quality. And you attract customers who'll always shop on price.
The concreters who win consistently don't win on being the cheapest. They win because:
1. They respond first
When a customer requests quotes from three concreters, the first one to call back and show genuine interest often gets the job — even if they're not the cheapest. Speed signals reliability.
2. They communicate the value
"$8,500 for a 50m2 exposed aggregate driveway that will last 30 years, comes with a 5-year workmanship warranty, and I've been doing this for 12 years in this suburb" is a different conversation than "$8,500 — let me know if you want to go ahead."
3. They follow up
Most concreters send a quote and never follow up. The customer is still "thinking about it" — which means they're comparing quotes and waiting to see who seems more reliable. The concreter who follows up twice, professionally, wins more often than you'd expect.
The Link Between Confident Pricing and Follow-Up
Here's the thing about following up: it's much easier when you know your pricing is fair.
If you've priced a job at what you know is market rate — or above it because you know your quality backs it up — following up isn't a negotiation. It's a service call. You're not chasing them to drop your price. You're checking in because they haven't said no, and the job is still there to win.
The concreters who underquote often struggle to follow up because they don't have much confidence in the job. The ones who price at market rate follow up because they know they've offered fair value and the customer just needs a nudge.
Kabooyaa handles the follow-up automatically — so you're not thinking about whether to call. The system calls for you (via an SMS sequence). You just show up when the customer is ready.
Frequently Asked Questions
How much does a concreter charge per square metre in Australia in 2026? Plain concrete runs $65-$90 per m2. Exposed aggregate is $100-$150 per m2. Coloured concrete is $90-$130 per m2. These are typical market rates for 2026 and vary by state, site conditions, and finish type.
How much does a concrete driveway cost in Australia in 2026? A standard 50-60 m2 driveway in plain concrete costs $3,250-$5,400 installed. Exposed aggregate for the same size runs $5,000-$9,000. Sydney and Perth are typically 10-20% above these figures; Adelaide is typically 5-10% below.
How much does a concrete slab cost in Australia? A standard garage slab (54 m2) costs $3,240-$4,590. A workshop slab (81 m2) costs $4,860-$6,885. House slabs (200-250 m2) typically run $12,000-$21,250. Pricing includes mesh reinforcement and formwork; site works and engineering may add cost.
Why are concreting quotes so different? Quote variation reflects differences in finish quality, site access, preparation work included or excluded, the concreter's experience, and whether demolition is included. Very low quotes often exclude preparation costs that will appear as extras, or reflect lower-quality materials and finishes.
How do concreters win jobs without being the cheapest? The fastest way to win more jobs as a concreter is responding faster than your competitors and following up quotes systematically. Most homeowners choose the concreter who communicated best — not necessarily the cheapest one.
If your pricing is fair and your follow-up is inconsistent, you're losing jobs to less capable concreters who just happened to call back. Fix the follow-up at kabooyaa.com.au — it's the fastest ROI in your business.
Related Reading
- Best CRM for Concreters in Australia (2026)
- How Concreters Can Build a Waiting List With Automated Lead Nurture
- How Much Does It Cost to Set Up a CRM for a Trade Business in Australia?
- How Much Does a Tiler Earn in Australia in 2026? (And How to Earn More)
- How Security Installers Can Get More Referrals Without Asking Awkwardly
